City of Brownfield employees weathered the wind and dirt Friday to repair damaged electrical equipment located on the Lamesa Hwy.  Electrical Department Superintendent Jeff Davis said a tractor had caused damage the equipment causing a power outage. Most of the outages were located on the southern side of the city.